Stabilization of Solid Waste
- Capacity
The solid waste stabilization system is invested in two phases. Phase 1 has a capacity of 5 tons/day, and phase 2 increases the capacity to 9 tons/day.
- Technological Process
The technological process for stabilizing solid waste is outlined in the...
Sản phẩm tái chế từ bùn thải: